Bathroom Remodel & Design in Elmhurst

Small rooms, exacting standards, ten minutes from the studio.

Bathrooms are the least forgiving rooms in an Elmhurst house. They are small enough that every tile cut and every fixture centerline is visible from three feet away, and they carry more trades per square foot than anywhere else in the project.

We design Elmhurst bathroom remodeling projects in full detail, with fixture layouts, tile drawings and vanity elevations finished before anything is ordered, then coordinate those drawings with your builder and trades.

What we design in an Elmhurst bathroom

Everything here is decided before demolition, because a bathroom punishes decisions made on site.

01

Plan and fixture layout

Toilet, vanity, shower and tub placed against the plumbing you have and the clearances the room needs.

02

Tile drawings

Pattern, coursing, niche alignment and cut lines drawn, so the tile setter builds rather than designs.

03

Custom vanities

Built to the room, including the alcoves and sloped ceilings of a 1920s second floor.

04

Stone and surfaces

Slabs and tile selected in person, with edge profiles and thresholds specified.

05

Fittings and metals

Plumbing, lighting and hardware chosen as one coordinated set of finishes.

06

Light and air

Face-level light at the mirror, dimmable layers overhead and ventilation sized for the room.

Two kinds of Elmhurst house

Which Elmhurst bathroom do you have?

Powder room with stacked vertical tile, botanical wallpaper, a wood vanity and black stone top
A powder room that commits to one idea rather than hedging.

Bathrooms in Elmhurst's 1920s houses

The Tudors, Colonials and Craftsman houses around Wilder Park were built with one bathroom, and every bathroom since has been fitted into a closet, a back bedroom or the space under the roof. The result is often a primary bath far too small for the house it serves.

The space usually comes from the plan rather than the finishes: a borrowed closet, a reworked hallway, or a small bedroom combined with the bath to make a real primary suite.

Plaster, old subfloors and original windows all shape the detailing. We draw the tile to the room as it really is, not as the original plans say it should be.

The space is found in the plan, not the finishes.

Not sure what your bathroom needs?

A walk through your home tells us whether your bathroom needs a remodel, or finishing and styling.

Book a consultation

How a Elmhurst bathroom remodel comes together

Five stages take a Elmhurst bathroom renovation from the first plan to install day. Bring us in at the first one, and we can shape every stage that follows.

  1. Plan and layout

    Before anything is chosen, we plan where the shower, vanity, toilet and tub go, what space can be borrowed from the rooms next door, and the clearances the room needs.

    What we deliverFloor plan and fixture layout.

Give the powder room something to say

The powder room is the one room in the house every guest spends time in alone, and it is small enough to commit fully to an idea: a lacquered wall, a hand-painted wallcovering, a stone you would never use in a kitchen.

Do not keep it neutral in the hope that it never dates. A bold powder room tells people something about who lives in the house, which is exactly what so many beautiful, expensive homes forget to do.

Remodel the bathroom, or finish and style it?

Not every Elmhurst bathroom needs to be gutted. The question is whether the problem is the plan or the layers that finish the room, and that decides which of our two services fits.

Service one

New Construction & Remodel

Likely when

  • The shower, tub or toilet is in the wrong place
  • The vanity has nowhere to put anything
  • You are building new, or turning small rooms into a primary suite

What's included

  • Plan and fixture layout
  • Tile drawings and stone selection
  • Custom vanities and millwork
  • Plumbing and lighting specifications
  • Collaboration with your builder, architect and trades
Explore New Construction & Remodel→
Service two

Interior Furnishings & Styling

Likely when

  • The layout and tile already work
  • The room is finished but feels anonymous
  • The primary bedroom and bath don't read as one suite

What's included

  • Mirrors and decorative lighting
  • Custom window treatments and soft goods
  • Art and accessory curation
  • Procurement and installation management
  • Final styling of vanities and shelves
Explore Interior Furnishings & Styling→

Many Elmhurst bathrooms need a little of both, and we will tell you plainly which. It is better to know that before you choose a single tile.

Selected bathroom work

Bathrooms and powder rooms from recent projects across Elmhurst and the western suburbs. See more in the full portfolio.

Explore by room

Every room asks a different question. See how we approach each one, starting in Elmhurst.

Swipe to see more →

Frequently asked questions

Can you design a larger primary bathroom in an older Elmhurst home?

Often, yes. The space usually comes from the plan: a neighboring closet, part of a hallway or a small adjoining bedroom. We work it out on the floor plan before any finishes are chosen.

In what order should a bathroom remodel be done?

Plan first, then build. The layout, then selections for tile, stone, vanity and fittings, then ordering, then construction, then installation and styling. Fixture choices set the plumbing rough-in dimensions, so they come before demolition.

What should you avoid when renovating a bathroom?

Lighting the room only from the ceiling, leaving the tile layout to be worked out on site, and choosing everything so it never dates. Each one is easy to fix on paper and expensive to fix once the tile is set.

Do you provide tile layout drawings?

Yes. Every tiled surface is drawn with its pattern, starting point, niche alignment and cut locations before installation begins.

How should a bathroom be lit?

At face level first. Sconces beside the mirror or a diffused fixture above it light a face evenly, while downlights alone cast shadows under the eyes. We layer both on dimmers.

When should we bring a designer into a new-build bathroom?

During framing, while blocking for sconces, niche locations and plumbing positions can still be set to match the design.

Is a bold powder room a good idea?

We think it is the best place in the house for one. It is small, used briefly and seen by every guest, so a dramatic wallcovering or stone reads as confident rather than overwhelming.

Do you work with our builder, plumber and tile setter?

Yes. Fixture specifications, rough-in dimensions and tile drawings go to your builder and trades, and we stay involved through construction.

Begin your Elmhurst bathroom

Tell us about your home and how you want to live in it. We will walk you through our design process and what working together looks like.