Kitchen Remodel & Design in Elmhurst

Our home town, and the kitchens we know best.

Elmhurst is where our studio is, which changes how a kitchen project runs here. A site visit takes ten minutes rather than half a day, so we see the room at the stages that matter: when the cabinetry is set out, when the stone is templated, when the first appliance lands.

We design Elmhurst kitchen remodeling projects from the plan out: layout first, then custom cabinets, stone and appliances, then lighting, hardware and the styling that finishes the room.

What we design in an Elmhurst kitchen

A kitchen is the most technical room in the house. We settle it on paper, ten minutes from your door.

01

Space plan and workflow

Sink, range and refrigeration placed against how your household actually cooks, with landing space where you need it.

02

Custom kitchen cabinets

Elevations for every wall, with profiles drawn to sit beside 1920s trim or to give a new build something to look at.

03

Stone and surfaces

Slabs chosen in person, with seams and edge details specified rather than left to the fabricator.

04

Appliance specification

Chosen early, because appliance dimensions drive the cabinetry and the lead times drive the schedule.

05

Lighting and electrical

Task, ambient and decorative layers documented for your electrician, with switching planned.

06

Hardware, styling and install

Faucets, hardware, stools and window treatments specified as one palette and placed by our team.

Two kinds of Elmhurst house

Which Elmhurst kitchen do you have?

Sage green kitchen with a plaster hood, marble backsplash and molded wood counter stools
Cabinetry detailed to sit beside original trim.

Kitchens in Elmhurst's 1920s houses

Around Wilder Park, Crescent Park and Eldridge Park, the 1920s and 1930s Tudors, Colonials and Craftsman houses came with original millwork, plaster walls and rooms that were never meant to open into one another. The kitchen was a work room at the back, and it is usually the room that has been remodeled worst.

The work is making it function now without stripping the character out. That usually means cabinetry detailed to sit beside the original trim, a pantry or back hall rebuilt as real storage, and one wall opened rather than all of them.

Walls in a 1927 house are rarely square and floors are rarely level. Cabinetry is drawn with scribe allowances for exactly that, so the finished kitchen looks like it was always there.

Open one wall, not all of them.

Not sure what your kitchen needs?

A walk through your home tells us whether your kitchen needs a remodel, or furnishing and styling.

Book a consultation

How a Elmhurst kitchen remodel comes together

Five stages take a Elmhurst kitchen renovation from the first plan to install day. Bring us in at the first one, and we can shape every stage that follows.

  1. Plan and scale

    Before anything is chosen, we space plan the kitchen and the rooms around it: island size, aisle widths, sight lines, the pantry and mudroom, and how the household actually moves through them.

    What we deliverFloor plan and furniture plan for the kitchen and the rooms it opens onto.

The advantage of a studio in town

Most of the problems that delay a kitchen project are discovered on site: a duct in the way of a hood, a floor that slopes toward the sink wall, a delivery that arrives damaged. Being fifteen minutes away at most means we see them the same day rather than the next week.

It also means we know the trades here, and they know how we draw. That is worth more on an Elmhurst project than any amount of specification.

Remodel the kitchen, or furnish and style it?

Not every dated Elmhurst kitchen needs demolition. The question is whether the problem is the plan or the layers that finish the room, and that decides which of our two services fits.

Service one

New Construction & Remodel

Likely when

  • The island or aisles are the wrong size for the room
  • A second person can't pass the cook
  • You are building new, or the kitchen doesn't connect to the rooms around it

What's included

  • Space planning and architectural review
  • Custom cabinetry and millwork design
  • Stone, tile, fixture and hardware selections
  • Lighting and plumbing specifications
  • Collaboration with your builder, architect and trades
Explore New Construction & Remodel→
Service two

Interior Furnishings & Styling

Likely when

  • The layout and cabinetry already work for how you cook
  • The kitchen is finished but doesn't feel like yours
  • The breakfast area and family room were never furnished to match

What's included

  • Counter stools, dining and lighting selections
  • Custom window treatments and soft goods
  • Art and accessory curation
  • Procurement and installation management
  • Final styling of shelves and surfaces
Explore Interior Furnishings & Styling→

Many Elmhurst kitchens need a little of both, and we will tell you plainly which. Some layout problems can't be solved without moving something, and it is better to know that before you choose a single stool.

Selected kitchen work

Kitchens from recent projects across Elmhurst and the western suburbs. See more in the full portfolio.

Explore by room

Every room asks a different question. See how we approach each one, starting in Elmhurst.

Swipe to see more →

Frequently asked questions

Do you design kitchens in Elmhurst's older houses?

Yes. A large share of our Elmhurst work is in the 1920s and 1930s housing stock around Wilder Park, Crescent Park and Eldridge Park. We detail cabinetry to sit beside original millwork and plan for plaster walls that are rarely square.

Should we open the kitchen to the rest of the house?

Usually one wall, not all of them. In an Elmhurst Tudor or Colonial, opening the kitchen to the family room while keeping a rebuilt pantry gives you the connection without losing the rooms that make the house worth owning.

When should a designer join a new-build kitchen in Cherry Farm?

While the house is framed. Cabinetry, hood, lighting and plumbing decisions made then land on the builder's schedule. The same decisions made after drywall become change orders.

In what order should a kitchen remodel be done?

Plan first, then build. Space planning, then selections for cabinetry, stone and appliances, then ordering, then construction, then installation and styling. Appliance sizes drive the cabinetry and both carry long lead times.

What does a kitchen designer do in a remodel?

Plans the layout, draws the custom cabinetry, selects stone, fixtures and lighting, and issues the drawings your contractor builds from. We stay involved through construction, then finish the room with furnishings and styling.

Does being local actually change anything?

It changes response time. The studio is in Elmhurst, so we see the site at the stages that matter and catch problems the same day rather than the following week.

Do you work with our architect and builder?

Yes. We issue cabinetry elevations, lighting plans and specifications, attend site meetings and stay involved through installation so questions are answered before they are built.

Do you design the rooms around the kitchen too?

Yes. Most of our Elmhurst work is whole-home, so the family room, dining room and mudroom are usually designed with the kitchen rather than after it.

Begin your Elmhurst kitchen

Tell us about your home and how you want to live in it. We will walk you through our design process and what working together looks like.