Old houses, small rooms and the details that matter in both.
Most of Western Springs' older houses were built with one bathroom, and every bathroom since has been fitted into a closet, a back bedroom or the space under the roof. The newer houses have the opposite problem: plenty of space, and nothing in it that couldn't be anywhere.
We design Western Springs bathroom remodeling projects in full detail, with fixture layouts, tile drawings and vanity elevations finished before anything is ordered, then coordinate those drawings with your contractor and trades.
Everything here is decided before demolition, because a bathroom punishes decisions made on site.
Toilet, vanity, shower and tub placed against the plumbing you have and the clearances the room needs.
Pattern, coursing, niche alignment and cut lines drawn, so the tile setter builds rather than designs.
Built to the room, including the alcoves, dormers and sloped ceilings of an older second floor.
Slabs and tile selected in person, with edge profiles and thresholds specified.
Plumbing, lighting and hardware chosen as one coordinated set of finishes.
Face-level light at the mirror, dimmable layers overhead and ventilation that works in a small room.

Victorians, Foursquares and Tudors were not built around a primary suite. The bath is usually small, often on a different wall from where it needs to be, and finished in whatever was fashionable the last time it was touched.
The space usually comes from the plan rather than the finishes: a borrowed closet, a reworked hall, or a small bedroom combined with the bath. Then the tile and vanity are drawn to the room as it really is, walls that are not square included.
The space is found in the plan, not the finishes.

New traditional houses get the space right and the character wrong. The bath is bright and generous and could be in any new house in the county.
The fixes are early ones. Vanity walls blocked for sconces at face level, niches framed where the tile layout wants them, and tile, trim and fittings chosen to match the period the house is built to suggest.
New construction gets the space right and the character wrong.
A walk through your home tells us whether your bathroom needs a remodel, or finishing and styling.
Five stages take a Western Springs bathroom renovation from the first plan to install day. Bring us in at the first one, and we can shape every stage that follows.
Before anything is chosen, we plan where the shower, vanity, toilet and tub go, what space can be borrowed from the rooms next door, and the clearances the room needs.
What we deliverFloor plan and fixture layout.
Tile, stone, vanity, fittings and lighting are chosen together, in person, so the metals and finishes read as one set.
What we deliverTile drawings, vanity elevations and fixture specifications.
Custom vanities, stone and fittings carry lead times, and the fixtures set the plumbing rough-in dimensions, so they are ordered before demolition.
What we deliverEvery order placed and confirmed against the drawings.
Your builder or contractor and tile setter build from our drawings. We stay involved so niche locations, blocking for sconces and tile cuts are right the first time.
What we deliverSite meetings and answers for the trades.
Mirrors, towels, art and accessories go in last, placed by our team, so the room is finished rather than just complete.
What we deliverStyling and the final install day.
A bathroom is used harder than almost any room in the house, and the difference between good fittings and ordinary ones shows within a few years: a valve that drips, a vanity finish that lifts, grout that never quite cleaned up.
Good materials last, and replacing things less often is the better outcome in every sense. That is the conversation to have early, before selections, so the parts you touch every day are the ones that get the attention.
Not every Western Springs bathroom needs to be gutted. The question is whether the problem is the plan or the layers that finish the room, and that decides which of our two services fits.
Many Western Springs bathrooms need a little of both, and we will tell you plainly which. It is better to know that before you choose a single tile.
Bathrooms and powder rooms from recent projects across the western suburbs. See more in the full portfolio.
Every room asks a different question. See how we approach each one, starting in Western Springs.
Kitchen→
Living Room→
Dining Room→
Family Room→
Bedroom→
Kids' Room→
Playroom→
Home Office→
Guest Room→
Whole Home→Swipe to see more →
Often, yes. The space usually comes from the plan: a neighboring closet, part of a hallway or a small adjoining bedroom. We work it out on the floor plan before any finishes are chosen.
Plan first, then build. The layout, then selections for tile, stone, vanity and fittings, then ordering, then construction, then installation and styling. Fixture choices set the plumbing rough-in dimensions, so they come before demolition.
Lighting the room only from the ceiling, leaving the tile layout to be worked out on site, and choosing everything so it never dates. Each one is easy to fix on paper and expensive to fix once the tile is set.
Yes. Every tiled surface is drawn with its pattern, starting point, niche alignment and cut locations before installation begins, including the out-of-square walls of an older house.
At face level first. Sconces beside the mirror or a diffused fixture above it light a face evenly, while downlights alone cast shadows under the eyes. We layer both on dimmers.
During framing, while blocking for sconces, niche locations and plumbing positions can still be set to match the design.
In what you touch every day: valves, fittings and the vanity finish. Those are the parts that show their quality, or the lack of it, within a few years.
Yes. Fixture specifications, rough-in dimensions and tile drawings go to your contractor and trades, and we stay involved through construction.
Tell us about your home and how you want to live in it. We will walk you through our design process and what working together looks like.